Solar panels and a new roof: planning one scaffold for both jobs

Having a roof done and thinking about solar? One scaffold can serve both jobs, but only if you plan the dates, the design and who is in charge before it goes up.

By the HTK Scaffolding teamPublished 4 min read
Access scaffold on a house roof set up for a domestic solar panel installation
HTK access scaffold to a roof for a domestic solar panel installation. Photo: HTK Scaffolding.

If you are having a roof done and thinking about solar panels, the scaffold is the cost and the logistics you can share. Plan it properly and one scaffold can serve both trades. Plan it badly and you pay twice, or the scaffold comes down the day before the installer arrives.

The Energy Saving Trust says scaffolding is needed for most roof-mounted systems, and installers might put it up a few days before the installation date. So it is worth deciding on solar before the roofer's scaffold is booked, not after. Here is what to check.

Why one scaffold can serve both jobs

Once the scaffold is up, fitting is quick. Which? says roof-mounted panels will probably need scaffolding, and once it is up the panels could be installed in less than a day.

That is why scaffolding can be the biggest shared cost between a re-roof and solar. One solar installer's guide calls it the single largest shared cost between the two jobs. That is an installer's view, so price the saving for your own house rather than assume it. If the roof comes first, our page on scaffolding for roofing explains what a roof scaffold normally involves.

The catch is timing. Roofing scaffold is usually hired for the roofing programme. If the solar installer cannot start until the roof is finished, the scaffold may be due down before they arrive. Our guide to how long scaffolding can stay up covers the practical limits.

If solar is only a maybe, do not leave the scaffold standing just in case. Extra weeks cost money and tie up your frontage.

Check the planning position first

Most homes do not need planning permission for solar panels. The Energy Saving Trust still suggests checking with your local planning office, because exceptions apply, for example for listed buildings, conservation areas and national parks.

Sort this out before the scaffold is booked. If permission is needed, the roof job and the scaffold dates will both move.

Who arranges the scaffold, and who is in charge

Practice varies. Solar installers normally arrange the scaffolding, but occasionally a small installer will ask the homeowner to book and pay for it. If scaffolding is not mentioned in the quote, ask the installer to say in writing whether it is included or expected from you.

Two firms on one roof also raises a safety management question. HSE's summary of CDM 2015 duties says a homeowner's client duties normally pass to the contractor on a single-contractor project, or to the principal contractor where more than one contractor is involved. With a roofer and a solar installer, ask who is taking that role. Do not assume.

Only a scaffolder should change the scaffold. HSE says scaffolds should be designed, erected, altered and dismantled only by competent people, under a competent supervisor. If the installer wants a loading bay or extra boarding, that is a call to the scaffolder.

Is the roofer's scaffold right for the panels?

Not always. For solar, a fully boarded platform is needed along the gutter, a little longer than the area of roof where the panels will go. A scaffold built for replacing tiles may not be set up the same way.

Ask the scaffolder to check the design against both jobs before it goes up. Think about where panels will be landed and stored as well. Our solar panel access page shows how we approach it.

Inspections carry on as normal while the scaffold stands. HSE says the law requires inspection of scaffolding from which a person might fall 2 metres or more, with a report on completion and at least weekly after that. If the scaffold stays up longer than first planned, ask to see the inspection record.

If the scaffold stands on the pavement

Extra weeks matter most where the scaffold is on or over the highway. Brighton and Hove City Council says you need a licence before putting things on pavements, roads or highway verges, and only specialist companies can take out a scaffold licence. Under its licence conditions, the contractor is responsible for renewing the licence if the scaffold is not removed before it expires.

Other councils run their own systems. Whichever applies, tell your scaffolder about the solar plan early, so the dates go into the application and nobody is chasing a renewal. Our guide to permits and pavement licences has the detail.

Questions to ask before you book

  • Is solar definitely happening? If so, tell the roofer and the scaffolder at quote stage.
  • Who is booking and paying for the scaffold? Get it in writing.
  • Who is the principal contractor? Name the firm.
  • Does the design suit both jobs? Ask the scaffolder to confirm.
  • What are the dates? Ask for the scaffold to stay until the installer finishes, and what the extra time costs.
  • Is there a pavement licence? Find out who renews it if the dates slip.

How HTK handles it

For a domestic solar install in Shoreham-by-Sea, we put up a single sided scaffold with full roof edge protection in a day, around close neighbours. You can see it on our Shoreham solar project page.

If you send us the roof details and the install date, we come back with a fixed price. If a roofer is already booked, tell us at the start so the scaffold is planned around both jobs.

Over to you

Did you add solar after the roof?

If you have had panels fitted around a roofing job, did you keep the scaffold up or pay for a second one? Tell us what worked, and what you would do differently.

Need a Scaffold in Sussex?

Send photos and the property address and we will come back with a fixed price and a clear hire period.