In the UK, a scaffold used for construction work must be inspected before it is first used, at least every seven days while it is in use, and after anything that could affect its safety, such as high winds or alterations. The rules come from the Work at Height Regulations 2005.
This guide explains the general position in the UK. Your quotation and a site assessment will confirm what applies to your property.
When inspections are needed
- Before first use: once the scaffold has been erected, and again after it is altered or added to.
- At least every seven days: for as long as the scaffold is in use.
- After events: anything likely to affect its strength or stability, such as storms, high winds, impact damage or someone tampering with it.
The seven day rule is a maximum, not a target. Busy or exposed sites may need checking more often.
Who carries out the inspection?
Inspections must be carried out by a competent person, meaning someone with the right training, knowledge and experience to spot problems with that type of scaffold. On most jobs this is the scaffolding contractor or a trained scaffold inspector.
Responsibility for making sure inspections happen sits with whoever is in control of the work, such as the main contractor, builder or client. Your quotation should say whether the scaffolding company is carrying out weekly inspections for you.
Need a scaffold?
Send us the address and a few photos. We will come back with a clear, fully explained quotation.
Inspection reports
After each inspection, the inspector writes a report before the end of the working period and gives it to the person the inspection was done for within 24 hours. Reports are kept on site until the work is finished, then kept at an office for three months. The report records the location, what was inspected, any risks found and what was done about them.
When a new scaffold is handed over, you should also get a handover certificate confirming it has been erected as designed and is ready to use.
What an inspector looks for
- Sound base plates and sole boards
- Standards, ledgers and braces in place
- Ties in the right positions
- Fully boarded working platforms
- Guardrails and toe boards fitted
- Safe ladder or stair access
- Sheeting and netting secure
- No unauthorised alterations
How HTK handles inspections
Every HTK scaffold comes with a handover certificate. Weekly inspections can be included in your quotation, and we can inspect after storms or before work restarts. Ask for inspections when you request a quote, and see our credentials for our accreditations.
Frequently asked questions
Is a handover certificate the same as an inspection?
No. The handover certificate confirms the scaffold is ready when first handed over. Regular inspections are still needed while it is in use.
Do towers need inspecting too?
Yes. Mobile and static towers are covered by the same regulations and must be inspected. See our access towers page.
What if the scaffold has not been inspected?
Do not use it until a competent person has inspected it. Contact the scaffolding company straight away.